Thursday, November 26, 2015
Progress by Thanksgiving 2015.
The building that was under attack has been taken down. Most of the wood is along side the fence in several locations. A shipping container was loaded the other day and probably on it's way overseas by now. They were working this morning and have been going 7 days a week.
Monday, November 23, 2015
When will they run out of shoes?
Last Fri. we were told that the person handling the mortgage claim took Wed., Thurs., and Fri. off leaving the paperwork on the desk. Now with Thanksgiving a few days away it looks like nothing will get done before next week. I'll have to call the movers again. They have already said we are the worst they have ever seen.
The cable guy just left as they are trying to figure out what is messing up our service. A new mode-m and line to the phone pole this time. After service was resumed the first call was a robo call. It's back to normal.
The cable guy just left as they are trying to figure out what is messing up our service. A new mode-m and line to the phone pole this time. After service was resumed the first call was a robo call. It's back to normal.
Wednesday, November 18, 2015
Tuesday, November 3, 2015
Another shoe hits the floor.
We signed another extension and the closing is set for Nov. 23. The buyers annuities are causing a lot of problems for the bank.
I called the movers and set them up for the two days after the closing and today they called back. They figure it will take 3 days now. The third day being the 28th, Saturday. It looks like we will have to do some packing so they can get it done in two days.
Kaman is slowly disappearing. The amount of wood is amazing. Beams about 12" x 18" x long are coming out. They are working on the roof taking that apart now . 7 or 8 people just removing nails.
I called the movers and set them up for the two days after the closing and today they called back. They figure it will take 3 days now. The third day being the 28th, Saturday. It looks like we will have to do some packing so they can get it done in two days.
Kaman is slowly disappearing. The amount of wood is amazing. Beams about 12" x 18" x long are coming out. They are working on the roof taking that apart now . 7 or 8 people just removing nails.
Subscribe to:
Posts (Atom)