Saturday, June 1, 2013
Progress so far.
A few pictures of the furnace installation. The stake in the ground is where the gas company should be putting the meter. I blocked the window to get the clearance needed for their vent. The furnace vent pipes go two into one through the small window. I imagine only one pipe will be seen going up with the smaller inside.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment