Friday, April 12, 2013
Rain, cold and wind.
The new combo switch came in the other day. It has a hole in the mounting bracket that the steering column passes through. I called the guy that bought Richards garage and set up an appointment to have him do it. I would end up with the air bag blowing up.
I got in a test flight with the P-39 and the changes worked. Tomorrow is forecast to be decent for flying so I'll get to really check them out. I enlarged the holes in the cowling on the StregA-36 and changed to an Xoar 13 x 6 prop. It's a first for me. I should get some APC props too.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment