It was assholes and elbows for a while getting the forms installed for the ramp. Then it started to rain but stopped a bit before the cement truck arrived. A flexible wheelbarrow was used to transfer the concrete to the forms and it proved a handfull. You can see the overage poured on the sand. I spread it out so it would be easier to break up later. It started to rain again so I put a cover over the cement.
I didn't like the way the door was installed and looked at the directions and found the tracks too far apart. It will be easy to fix that.