Thursday, February 7, 2013

The waiting game.

I see on FB that there is a French toast party in the making. I only got gas in case of power failure and for the snow blowers. I did manage to get to the field this noon. I put in 2 flights with 2 ounces of fuel each and did the maneuvers that need the most power and control deflection. I was satisfied with those flights so I put in a full load and did the entire pattern. I need to take some of the down out as it is too sensitive and the up is just right. At home I installed a longer control horn on the elevator and lengthened the horn arm a quarter of an inch.

No comments: