Friday, July 30, 2010

Two looking for three.

So far I've run two of the three engines. I need a front bearing for the third and rear covers for two of the three. I timed 3-1/2 ounces in the latest one and got 6 minutes or run time. Not too shabby. I have one plane without an engine and one on the drawing board. I may get the stuff from Fox on Saturday.

No comments: