Saturday, January 4, 2014

Progress so far.

I got most of the wing built today as the temperature outside was building season. I managed to build the stab/elev., engine crutch, rudder/fin, and flaps while waiting for the rib set to come in.I'm happy with the fit of the wing in the fuselage cutout. It's the best fit I've ever had. I used a quarter to draw the leading edge radius on the wing tips and wondered how to get it the same all the way along the wing. I used a saw and marked the depth of the radius nose on the blade and cut 4 cuts in the leading edge s depth markers. I planed the nose down to the marked depth and then planed the radius and sanded it closer.

No comments: